Irvine, CA
Get your Irvine roof looked at properly
Buying a house, selling one, or arguing with an insurer — all three go better with a written roof report in hand.
Describe the inspection job
Three questions, then the address. Up to three Irvine contractors who do this work.
Your request is in.
We are matching it now against roofing contractors working in Irvine and the surrounding area.
- Today, usually within the hour. The first contractor calls or texts the number you gave us. ASAP requests go out first.
- Up to three of them, no more. We cap it at three so you can compare without your phone melting.
- They come and look. Estimates are given after somebody has been on the roof, not over the phone.
- You decide, or you do not. There is nothing to cancel and nothing to pay us.
If you do not hear anything today, check your voicemail and spam folder — contractors often call from a mobile number.
Before you let anybody on the roof
The things worth pinning down on a inspection job. A contractor who has not raised them has not looked properly.
- Whether the inspection includes going into the attic
- Photographs of anything they flag
- Whether the fee comes off the job if you proceed
- An estimated number of years left in the covering
- A written report, not a verbal summary
The point of an inspection is not to find a disaster. It is to find the two hundred dollar problem before it becomes a twelve thousand dollar one.
Either way, ask for photographs. A report with pictures of your actual roof is worth ten times one with a tick-box condition rating.
Ask for an estimated remaining life in years, and what would extend it. That answer is the useful part.
Locally
Behind it: morning fog that sits on the roof until mid-morning. The north side of a house here ages years faster than the south side, and almost every roof gets replaced because of it.
About inspection here
What does a new roof cost in Irvine?
For a typical Irvine home of about 25 squares, an architectural asphalt re-roof usually lands between $11,500 and $29,500. Tile, slate and standing-seam metal run well above that. The number moves on how many old layers come off, how much decking is soft underneath, and how easily a truck can get to the house.
How long does a re-roof take?
Two days is typical for asphalt. Add days for steep pitch, multiple layers to strip, tile work, or a roof with a lot of valleys and penetrations.
Should I take the cheapest quote?
Not automatically. Put the quotes side by side on layers, not on totals — underlayment, ice-and-water, drip edge, valley treatment, ventilation, decking allowance, warranty. Cheap usually means less of those, not the same roof for less money.
What should I do to prepare?
Clear the driveway, protect attic storage from falling dust, and plan for two loud days. Agree in advance where the dumpster goes and who sweeps for nails.
What is it going to cost?
No cost, no obligation, and never more than three contractors.
